PROJECT DETAIL

NuStar Energy SPM Hose Replacement

April , 2011

Working off the DSV DPII Ocean Carrier, we provided saturation diving services as required to disconnect the existing dual 24″ hose section from the PLEM (Pipe Line End Manifold) on bottom. Once the existing hose has been removed from the SPM (Single Point Moor) buoy and attach the new hoses, the hoses were reconnected to the same structure.